It takes $6$ technicians a total of $10$ hours to build a new server from direct computer, with each working at the same rate. If six technicians start to build the server at $11:00$ am, and one technician per hour is added beginning at $5:00$ pm, at what time will the server be completed?

  1. $6:40$ pm
  2. $7:00$ pm
  3. $7:20$ pm
  4. $8:00$ pm

1 Answer

Best answer
1 1 vote
To complete the job 6*10=60 man/hours are needed.

By 5:00 PM 6*6=36 man/hour done. 24 is left.

5:00 PM - 6:00 PM 7 man/hour;    ->36+7=43

6:00 PM - 7:00 PM 8 man/hour;    ->43+8=51

7:00 PM - 8:00 PM 9 man/hour.    ->51+9=60(work completed)  

 

Hence,Option(D)8:00 pm.
• selected by
Position:
Show:

Related questions

0 0 votes
0 0 answers
1.7k
1.7k views
Misbah Ghaya asked Dec 31, 2015
1,707 views
A ship $55$ kms, from the shore springs a leak which admits $2$ tonnes of water in $6$ min; $80$ tonnes would suffer to sink her, but the pumps can throw out $12$ tonnes ...
2 2 votes
1 answers 1 answer
3.2k
3.2k views
Misbah Ghaya asked Jan 1, 2016
3,220 views
$\text{A}$ and $\text{B}$ throw with one dice for a stake of $\text{Rs.}\;11$ which is to be won by the player who first throw $6$. If $\text{A}$ has the first throw, wha...
0 0 votes
0 0 answers
1.3k
1.3k views
Misbah Ghaya asked Dec 31, 2015
1,345 views
There are three coplanar parallel lines. If any $p$ points are taken on each of the lines, then find the maximum number of triangles with the vertices of these points.$p^...
0 0 votes
0 0 answers
1.7k
1.7k views
Misbah Ghaya asked Dec 31, 2015
1,718 views
Two vertical lamp-posts of equal height stand on either side of a road $50$ m wide. At a point $\text{P}$ on the road between them, the elevation of the tops of the lamp-...
0 0 votes
0 0 answers
1.4k
1.4k views
Misbah Ghaya asked Dec 31, 2015
1,367 views
If $x=1+2a+3a^{2}+4a^{2}+\dots(-1 < a < 1)$ and$y=1+3b+6b^{2}+10b^{3}+\dots(-1 < b < 1),$then find $1+ab+(ab)^{2}+(ab)^{3}+\dots$ in terms of $x$ and $y$.$\frac{x^{1/2} y...